The cable-stayed portion has three spans with lengths 192 m, 434 m and 192 m. The bridge has two lanes in each direction plus an emergency lane and a dedicated lane for motorcycles.
The bridge was built by a consortium of Indonesian companies PT Adhi Karya and PT Waskita Karya working with China Road and Bridge Corp. and China Harbor Engineering Co. Ltd. The total cost of the project, including connecting roads, has been estimated at 4.5 trillion rupiah (US$445 million).
Construction was started on August 20, 2003. In July 2004, a girder collapsed, killing one worker and injuring nine others. Work on the bridge halted at the end of 2004 due to lack of funds, but was restarted in November 2005. The main span of the bridge was connected on March 31, 2009, and the bridge was opened to the public in June 10, 2009.
Source: http://en.wikipedia.org/wiki/Suramadu_Bridge
Suramadu bridge miniature
Status: Under development project
Scale: 1:2000 (estimated) see the finished model
The kit and finished model, 1:2000 half (60 cm version)
The kit, 1:2500 half (40 cm version)